Wattleby Electric LLC
Licensed electrical contractor · Lic. #EC-00000
48 Commerce Loop
Oak Haven, GA 30500
(706) 555-0128 · office@wattleby.example
Estimate
- No.
- EST-0774
- Date
- November 9, 2026
- Valid until
- December 9, 2026
Prepared for
Greta and Sam Novak
2207 Old Ferry Rd
Oak Haven, GA 30500
(706) 555-0184 · novak.house@example.com
Service upgrade — 100 A to 200 A panel and meter base
Replace the existing 100 A panel and meter base with a 200 A service; transfer and label all existing circuits; update grounding and bonding; add whole-home surge protection. We coordinate the utility disconnect and reconnect.
| Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|
200 A main breaker panel, 40 spaces 1 ea × $640.00 | 1 | ea | $640.00 | $640.00 |
200 A meter base and service entrance conductors 1 set × $780.00 | 1 | set | $780.00 | $780.00 |
Grounding electrode system update Ground rods and bonding as required 1 job × $340.00 | 1 | job | $340.00 | $340.00 |
Whole-home surge protective device 1 ea × $285.00 | 1 | ea | $285.00 | $285.00 |
Panel replacement labor Remove old panel, mount new, transfer and label all circuits, torque all terminations 1 job × $2,400.00 | 1 | job | $2,400.00 | $2,400.00 |
AFCI/GFCI breakers where the inspector requires them Unit price; final count confirmed at inspection 8 ea × $58.00 | 8 | ea | $58.00 | $464.00 |
Permit and inspection (estimated, at cost) 1 ea × $185.00 | 1 | ea | $185.00 | $185.00 |
Utility disconnect and reconnect coordination Included 1 ea × $0.00 | 1 | ea | $0.00 | $0.00 |
- Subtotal
- $5,094.00
- Sales tax (example rate 7%)
- $151.83
- Estimate total
- $5,245.83
- Deposit to schedule and order equipment (30%)
- $1,573.75
| Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|
Generator inlet and interlock kit 1 ea × $690.00 | 1 | ea | $690.00 | $690.00 |
Dedicated 240 V circuit for a future EV charger 1 ea × $780.00 | 1 | ea | $780.00 | $780.00 |
Drywall patch and paint around the new panel 1 ea × $220.00 | 1 | ea | $220.00 | $220.00 |
Notes and terms
- Price assumes the panel stays where it is. Relocating the panel or service is a different scope.
- Power will be off for most of one day; we schedule around you and the utility.
- If existing branch circuits turn out damaged or unsafe during the transfer, we'll show you and price repairs before continuing.
- Payment schedule: 30% deposit; balance when the final inspection passes.
How to pay: Deposit by card or bank transfer (ACH) through the pay link on your deposit invoice.
Customer signature — I accept this estimate and its terms
Date