Graystone Flatwork LLC
Driveways · Patios · Sidewalks
7340 Quarry Line Rd
Prairie Bluff, KS 66000
(316) 555-0145 · office@graystone.example
Estimate
- No.
- EST-0517
- Date
- November 6, 2026
- Valid until
- December 6, 2026
Prepared for
Teresa and Owen Hale
1180 Bluestem Ct
Prairie Bluff, KS 66000
(316) 555-0157 · hale.family@example.com
Stamped concrete patio — 16 × 20 ft with steps
| Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|
Excavate and grade for patio 320 sq ft × $1.40 | 320 | sq ft | $1.40 | $448.00 |
Base, 4 in. compacted crushed stone 320 sq ft × $1.10 | 320 | sq ft | $1.10 | $352.00 |
Forms and layout 1 job × $350.00 | 1 | job | $350.00 | $350.00 |
Concrete, 4,000 psi with fiber 16 × 20 ft × 4 in. = 4.0 cu yd, plus overage 4.5 cu yd × $168.00 | 4.5 | cu yd | $168.00 | $756.00 |
#3 rebar at 18 in. on center 320 sq ft × $0.85 | 320 | sq ft | $0.85 | $272.00 |
Place and stamp, slate pattern with integral color 320 sq ft × $7.25 | 320 | sq ft | $7.25 | $2,320.00 |
Release agent and sealer, 2 coats 320 sq ft × $0.95 | 320 | sq ft | $0.95 | $304.00 |
Steps, 3 risers, formed and stamped Concrete for the steps included 1 ea × $850.00 | 1 | ea | $850.00 | $850.00 |
- Subtotal
- $5,652.00
- Sales tax (example rate 7.5%)
- $56.70
- Estimate total
- $5,708.70
- Deposit to schedule the pour (35%)
- $1,998.05
| Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|
Seat wall, 12 ft, with stamped cap 1 ea × $2,400.00 | 1 | ea | $2,400.00 | $2,400.00 |
Reseal patio (scheduled maintenance visit) 1 ea × $380.00 | 1 | ea | $380.00 | $380.00 |
Notes and terms
- We request utility locates through 811 before excavation.
- Color can vary from the sample board with weather, the batch and finishing.
- Stamped concrete needs periodic resealing to keep its color; we'll tell you when.
- Pour dates depend on the weather; a rained-out day moves the schedule, not the price.
How to pay: Deposit by bank transfer (ACH) or card through the pay link on your deposit invoice.
Customer signature — I accept this estimate and its terms
Date